This project is the construction project of Lamashegu 34.5kV substation and TM2 power evacuation secondary transmission line. A new 34.5 kV Lamashegu substation will be built, including 2 20/26MVA transformers, indoor 34.5 kV&11.5 kV switchgear, 2 34.5 kV incoming line intervals, 8 34.5 kV outgoing line intervals, 9 11.5 kV outgoing line intervals, and related civil engineering works. Package B: 4km 34.5kV buried cable line, 9km 11.5kV steel pole overhead line. At the same time, a new 34.5 kV Adubiyili switchyard will be built, including 12 indoor 34.5 kV switchgear, 2 34.5 kV incoming line bays, 10 34.5 kV outgoing line bays, and related civil engineering works.
We successfully completed the product supply for the project construction and passed the customer's local on-site testing of the product. The performance of the product met the standard requirements of the Ghana Power Supply Authority.